![]() ![]() They will do more of the engineering if you want/ need. You should call Warmboard - they are very responsive. A block of wood and rubber mallet and it is in the grove. Again - they finished up faster vs what they allowed. Same with the HVAC people - new product for them and they had little experience with PexALPex. There is a contractor learning curve with Warmboard - they all look at it like it's going to be a problem and after they have the 4th sheet down they love the stuff. It was just turned on three weeks ago and working as expected. My current project has about 3k sf of the building Warmboard - the other 2k is evenly split between a new slab and a large living room that we did not remove - installed retrofitted plates. ![]() The product worked as advertised - the heavy AL panel really grabs the PEX and transfers the heat. Much debate back then about radiant and wood flooring and I needed enough BTU's. New room had lots of windows, open on three sides to the weather. The existing house had a wood floors - needed the new wood floor to flow as if built at the same time. We used it over a new slab w/ foam board insulation. The product was very new and they only made the S product initially. my fist being a 500sf one story bump out in the early/mid 00's. Have done quite a few projects with Warmboard. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |